SPOOKY SALE Grab Spooky Halloween Deals – Up to 50% OFF

Attractive Compass Template For Presentation Slide Design

Nodes

Compass template illustrating corporation strategy with directions for commodity, communication, channel, and cost.

Colors

    P.ID : 67662
    149 Views
    15 Downloads
    Kavitha Designer
    Get Custom Slides by Experts
    Enhance Your Presentations with Add-ins

    Tags

    • Compass Shapes
    Advertisement

    Four Noded Compass PPT Slide

    Download this Compass Template PowerPoint Slide to make an incredible business presentation. It is a well-designed, content-ready slide that comes with all the elements needed to make a professional-looking presentation. It is an easily editable slide that allows you to modify the look and feel to fit your needs.

    About the template

    The Compass Template PowerPoint Slide has a well-designed compass shape. In this compass, N refers to national and international, E refers to economic, S refers to social and cultural, and W refers to the weather. It has four nodes to present the communication, commodity, cost, and channel. It is the best tool for competitor analysis. Find more business presentation slides from SlideEgg!

    Features of the template

    • 100% customizable slides and easy to download.
    • Slides are available in different nodes & colors.
    • The slide contained 16:9 and 4:3 formats.
    • Easy to change the slide colors quickly.
    • Well-crafted template with instant download facility. 
    • It has a creative compass design. 

    More Collections for Attractive Compass Template

    Recommended based on this template.


    Similar Templates to Attractive Compass Template

    Free
    Two step infographic layout with yellow and blue gradient boxes labeled 01 and 02, linked to icons and captions.
    A modern diagram with linked loops representing different concepts, each containing a distinct icon and caption areas.
    Compass Icon PPT For Presentation
    Free
    Gold rimmed black compass at the center with four text boxes positioned around it on a white background.
    Free
    Compass PowerPoint slide with a colorful compass design on the left and a text box on the right.
    Compass PowerPoint Design Model-Four Node
    Simple Compass PPT Template Slides

    Showing20 of69,218 templates